image banner
News
  • Curent online: 1
  • Today: 1
  • Current Week: 1
  • Total connection: 1
Login
Talks on construction of special-use bridge for the Soc Giang (Vietnam) - Ping Meng (China) border gates.
The delegation of the Peoples Committee of Ha Quang district (Cao Bang province, Vietnam) led by Mr. Be Van Buu, Vice Chairman of the Peoples Committee of Ha Quang district and the delegation of Napo district (Guangxi, China) led by Mr. Li Wencheng, Deputy Head of the Peoples Government of Napo district held an on-site talks for checking as well as comparing the parameters, technical standards, and amending the project construction plan for the construction of special-use bridge for the Soc Giang (Vietnam) - Ping Meng (China) border gates.
anh tin bai

The view of the meeting

As a result, the two sides agreed: the Chinese side shall amend and complete the Design Plan for the construction of special-use bridge for the Soc Giang (Vietnam) - Ping Meng (China) border gates by June 15, 2023 and send it to the Vietnamese side for re-checking. The Vietnamese side shall return the results of the re-checking and the Vietnamese version of the design plan to the Chinese side by July 15, 2023. After having agreed on the design plan, the two Sides report to their superiors for approval.

N.H
ipv6 ready Chung nhan Tin Nhiem Mang